Phase 1, Branston Locks, Burton-on-Trent

Project Overview

A project for Nurton Developments (Quintus) Limited

The project successfully delivered circa 230k sq. ft of Grade A industrial space, over 3 buildings in Burton-on-Trent.  This includes site infrastructure, yards and car parks, together with a drainage swale.   The site itself was situated in the National Forest and so the buildings had to be designed sympathetically to accommodate this.  This was achieved by installing timber cladding to the building, providing cycle shelters with timber struts and a comprehensive planting scheme along the swale to reflect the location in the National Forest.

Project Value:

£13.44 million

Project Duration:

30 weeks

Key Facts:

  • The car parking benefitted from 10% of the spaces have EV charging capability with the infrastructure installed to double this to 20% in the future if needed
  • The implementation of the electrical infrastructure incorporated a directional drill under the A38 whilst it was still in operation