The project successfully delivered circa 230k sq. ft of Grade A industrial space, over 3 buildings in Burton-on-Trent. This includes site infrastructure, yards and car parks, together with a drainage swale. The site itself was situated in the National Forest and so the buildings had to be designed sympathetically to accommodate this. This was achieved by installing timber cladding to the building, providing cycle shelters with timber struts and a comprehensive planting scheme along the swale to reflect the location in the National Forest.
£13.44 million
30 weeks