Works included the removal of the existing top surface and improvements to the sub base and drainage.
An all weather hockey pitch was re-laid with markings for hockey, tennis and netball. Selection of the playing surface was a key decision, with tiger turf being the preferred solution for this situation.
£200,000.00
5 weeks